Gantt Graph Definition
Gantt Chart Introduction
Gantt Chart, also knownCrosstab chartFigure(Bar chart). Yes1917Developed by Henry Gantt in the year, the internal idea is simple. It is basically a line chart, with a horizontal axis representing time and an vertical axis representing activity.(Project), Line indicates the planned and actual activities completed throughout the period. It intuitively shows when the task is scheduled and compares the actual progress with the plan requirements.
The manager can easily find a task.(Project)What else is to be done, and whether the work is delayed or normal. Is an ideal control tool.
Gantt Chart description
A Gantt chart has three meanings:
1, Display activities in the form of graphs or tables;
2Now is a general method for displaying progress;
3, The actual calendar day and duration should be included in the construction, and the weekend and holiday should not be included in the progress.
Gantt charts are simple, eye-catching, and easy to compile. They are widely used in enterprise management. Gantt charts are classified into five types based on different content, including plan charts, load charts, idle machine charts, idle personnel charts, and schedule tables.
Gantt chart table definition
1Gantt chart table
In the Gantt chart, the horizontal axis represents the time, and the vertical axis represents the name, operator, and serial number of the machine and equipment. The plan is represented by lines, numbers, and text codes in the chart.(Actual)Time required, plan(Actual)Output, plan(Actual)Start time or completion time.
2, Gantt chart with sub-items
3, Gantt chart with sub-project and Sub-Project Network
Gantt Chart deformation-Load
The vertical axis does not list activities, but lists the entire department or specific resources. The load chart allows managers to plan and control production capabilities.