Look accustomed to Taobao Ali Ued team to do the map, suddenly a little impulsive, the formation of a belong to our own ued. No Ali, Baidu, Tencent and other large internet companies have dedicated ued team members, but we work with their own team to set up their own mobile phone client ued.
1, demand research and analysis:
Any product needs to investigate the market, including the presence of competitor analysis and existing opponents, including how many companies will develop the same product in a short time, and the threshold for developing the product. This part of the work needs the market, PM and even the boss's joint efforts. If the product is a customer-specific requirement, there is a need to analyze how much of the product is similar in the market, including the core advantages of the product.
Output: Survey report
2. Requirement determination and wireframe
When you understand this product and have an understanding of the product as a whole, need to write MRD, wireframe, demand Confirmation, write MRD is for the boss, and this is to the boss to the root of resources, a person's resources are limited, a lot of time to ask the boss resources, such as lack of manpower, if the phone encountered a certificate problem, Including fee applications can be written in MRD. At the same time as a PM should be the product of the approximate composition has its own ideas and impressions.
Output: MRD, wireframe, demand confirmation list
3, PRD, high-fidelity prototype
When the requirements are confirmed, PM can write PRD, at the same time, interactive designers can start to do high fidelity prototype, is usually first PRD after the start to do high-fidelity prototype, but the company lacks interactive designers, so PRD and high-fidelity prototypes are completed by PM, so basically high-fidelity prototype and PRD sometimes not in succession, At the same time in the PRD to put the relevant prototype description. PRD and prototypes need to be followed by several rounds of "bombing", and the reviewers are: BOSS, market, PM, interaction Designer, developer, UI vision, test, etc., to determine whether feasible, and the problems encountered.
Output: PRD, high-fidelity prototype
4, pictures, Chettu, high security pictures
When requirements are determined, the UI vision requires product design, based on the high Fidelity prototype. UI vision needs to be in the process of designing a product with PM, development, testers to maintain communication, because the effect of the image may be in the mobile phone interface results are not as satisfactory as expected, while testing the UI design testing, UI testing is mainly performed by the test department, UI design Department in addition to visual output, Also submit a simple document for development and test use, the UI test should be started synchronously when the research and Development department has the visible output, the test department can test the uit effect first, then file it after the test is completed, and confirm with the UI, and if it is correct, it will be included in the bug management system. The UI output and documentation are tested for acceptance of the entire software UI. UI confirmation is for the market and the customer, when the market or the user has no objection to the interface effect to start the relevant page design, the general UI out of the picture first three: login, nine Sudoku, splash screen.
Outputs: UI pictures, UI confirmations, UI test reports
5, development
Development phase will encounter all kinds of problems, communication becomes the main means, development and PM, UI, testing and other effective communication is particularly important, development cycle control. This requires pm to coordinate, while helping to resolve resource needs issues (for example, mobile phone certificate class applications).
Output: Demo Products
6, testing
Testing from the requirements of the determination has been followed this product, while the UI interface Test, product demo version of the test, many companies to the test process is not important, or shorten the test time is very short, normal testing should be the development time of 1-1.5 times times. The test undertakes the product interview before the final check work, appears particularly important, needs to the product will appear each kind of question to carry on the unceasing test, we once to Amoy the shopkeeper after the day and night does not turn off the uninterrupted test, is in order to let the product before the release as far as possible some bugs, Ensure that the product is delivered to the user as few problems as possible. At the same time the test needs to cooperate with the development of the Operation Manual, UC, FAQs and other documents written.
Output: Test report, UC, FAQ, Operation manual
7, Beta release
When the test to solve the 60%bug (no product is 100% to solve the BUG released, are through version upgrade to solve the problem of bugs, while no panic type of large bugs, the product of the beta version needs to be released to a certain user use, this period will appear a lot of problems, timely user feedback work , system analysis and so on. The operation report needs to be good to the user's opinion collects, the analysis, simultaneously the PM needs to follow up constantly, carries on the analysis to the product problem, to BETA2, Beta3 and so on the improvement, simultaneously digs the data, to the user product demand improvement at the same time, completes the two period product plan.
Output: Beta version of products
8. Official release
When the product needs to formally face the user, the bug has actually been solved 80%, can be very good to meet the user's use, you can determine this version, and when the product is officially released, the second phase of the product planning should have 30% progress, because at this time has a certain operational reports to do data support, At the same time for the feedback of users also made a detailed analysis of the new product features will also appear.
Output: Official version of the product
Each company has its own ued, but a lot of this process is invisible, more companies need to be suitable for their own ued process, to ensure that the product goes more smoothly, more users to use their own products. Ued exist for the user, but also for their own products.
Source: http://www.537520.com/?p=426