The dollar index in the vicinity of 79 points of stability signs, crude oil more space for fierce competition, upper and lower shadow line longer, the copper short-term callback, the electronic disk is a bit weak. Domestic stock market strong and innovative high. Shanghai gum Trend more independence, the morning strong pull up, and then innovative high, afternoon prices continue to slide, short power temporarily prevailed, 1001 contracts become the most active month, close to 17,445 points, positions increased more than 25,000 hands. Thailand's raw materials market sold 479 tons, the average price of 55.28 baht, further rise. Recent spot trading sentiment and futures are closely linked, raw materials are also loose, and some factories on the rapid rise in the price of plastic is still holding a wait-and-see attitude. In addition, with the rapid rise in the futures market, the term may appear arbitrage opportunities, a certain degree will reduce the current price difference, but after all, the market speculative force is strong, this impact is not too big. Technical breakthrough after rapid rise, not like a false breakthrough, the top of the Shanghai rubber is still rising space, technical form is very good, the rising channel has not been destroyed. In addition, the rally is also facing short pressure and long profit, short-term callback is inevitable, if the cost is not too high the proposal to continue to position, still think that the callback opportunity is better intervention or point of addition.
The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion;
products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the
content of the page makes you feel confusing, please write us an email, we will handle the problem
within 5 days after receiving your email.
If you find any instances of plagiarism from the community, please send an email to:
info-contact@alibabacloud.com
and provide relevant evidence. A staff member will contact you within 5 working days.