100 acres of farmland in the East China Sea was illegally occupied by building villas

Source: Internet
Author: User
Keywords Reporter Homeland villager
The villa in the wheat field the 100 mu of arable land of Jiangsu Donghai County Stone Bridge was developed into a villa. Township, said this is the new rural construction demonstration project; Villagers said that this is used for the sale of real estate development projects, the Chinese Economic Times reporter received a report: Jiangsu Donghai Bridge Wu Zhuang village, 100 mu of farmland was illegally occupied by building villas, the local township people called the new rural construction model villages "Green Spring River Kang Ju xin qu"  is actually used for external sales of real estate development projects, and there are problems such as the first build. Stone Bridge is located in the east side of the township, East and two-store town bordering, 236 Provincial road Trans-things.  The village by the original Wu Zhuang Cun and Stone Bridge, a total of 6 villages, 7 village groups, 687 households, 2750 people, cultivated area of 4988 mu, per capita 1.81 mu.  Wu Zhuang Village is located in the east of the Spring River, from the township station 1 kilometers, 1120 people, 290 households, cultivated area of 2044 acres, the existing housing 1232, per capita housing 1.1, the size of 287 acres.  "Trickery"? "Spring River Kang-ju New Area" is located in the Wu Zhuang village of Spring River East, Yang Bridge, the south side of the East Tan Highway, the west is the town street. Reporters at the scene, has completed a total of 30 villas, north of the 236 provincial road.  Among them, the periphery 25 sets for the upper and lower two layers of the platoon, the commercial and residential, the first floor is the façade; the inside 5 sets of two-storey single-family villas, each set of 2 3, an area of about 256 square meters. In the "Fresh Spring River Kang Ju xin qu" phase one project opposite the market, the reporter saw Wu Zhuang village villager Du Peimin.  He, who had lost his farmland, was squatting on the ground at the moment, smoking a stuffy smoke. "Two years ago, these villas were our crops. Du Peimin told our correspondent, November 2007, by the township people called the new rural construction model village project "Fresh Water River Kang-ju" groundbreaking, 290 households 1120 100 mu of arable land was occupy.  In the April 2008, when the villagers saw the "Green River, the new district," the sales leaflets, only to understand that the arable land is used for foreign sale of the villa development.  Wu Zhuang village of more than 10 villagers in the interview with this reporter confirmed Du Peimin's argument. "Before planting corn and other crops, every acre of land there is a thousand yuan income." Now, we have not got a penny compensation. Villagers have repeatedly found the village and township leaders to claim that this is the new rural model construction. We have many times to the county Land Bureau, the provincial Department of Homeland reflected, there is no result. "Du Peimin Home has more than 4 acres accounted for, the entire group of 1.3 acres of land per capita." Villagers Liu Chunhua told reporters that the occupied area of the villagers did not receive compensation money.  This, this reporter also from the township Deputy Township Cho Gwangyao there has been confirmed.  In the sales office, our correspondent saw the "Fresh Spring River Kang-ju new Area" of the sales leaflet, clearly marked the house is a villa, the first phase of the project covers an area of 65 acres. This reporter to buy a house in the name of the Villa sales office in charge, the official said, now the house sold very well, formalities are also complete, and denies having been shut down.  In the identity of the reporter to buy a house suspicion, the person in charge began to ask questions and not answer, also refused to say the name of the developer.  North Goussey, Ruzhuang, a number of village cadres told our correspondent, Township party committee requires each village cadres must be sold within six months five sets of villas, or pay 3000 yuan sales deposit will not be refunded. "Because the legality of the land has led to the absence of property rights in these villas, few people have been asked." It seems that 3000 yuan deposit will be ruined.  A village cadre said.  It is understood that the Wu Zhuang village, a family leader surnamed Liu refused to pay a deposit and mobilize the masses petition, has been dismissed.  The land was occupied? "The Land is occupied!" Villages and villages did not hold the villagers ' Congress and party congress, did not obtain the consent of the villagers.  Villager Liu Chunju said. If the farmland is gone, it means the rice bowl is gone. Compensation for a penny no, how to spend the rest of the day?  This is the reporter among the villagers heard the most questioning voice.  May 25, in the Donghai County Land and Resources Bureau, from the Law Enforcement Supervision Brigade staff there, the reporter learned Donghai County Mountain left Mouth Township party secretary Wang Hua's mobile phone number. Wang Hua in the telephone interview with the reporter said: "This is the village to engage in urban and rural integration, is a dual focus of the pilot work, because the village is more dispersed, must be demolished the villagers of the old house, the whole farmland, this is to make new rural construction, improve the villagers living environment, do not  "For the village cadres on the" Township party committee requires each village cadre must sell five sets of villas in half a year, otherwise pay 3000 yuan sales deposit all do not refund ", Wang Hua also in the telephone expressed recognition.  When it comes to farmers reporting the township government to illegally encroach on farmland to build property development, Wang Hua's explanation is, "the project is approved by the County committee, the county government, but also Lianyungang to build a demonstration model room."  Reporters in the investigation that March 2008, the left mouth of the village of the township, "Wu Zhuang relocation Project Planning book", the village lived scattered, the roadway is not tidy, resulting in the waste of land resources, to the overall planning of the village brought difficulties, this is to be Wu Zhuang Cun the reasons for the overall relocation. Wang Hua said, "according to the Jiangsu Province Department of Homeland regulations, the village relocation increased land indicators, the village can be 30% of indicators, so no need for any approval procedures."  "In view of Wang Hua's argument, this reporter contacted the Lianyungang government office, an unnamed staff member said did not know."  And for "No need for any approval procedures," the Donghai County Bureau of Land and Resources Administration Supervision Brigade deputy Captain Wang Keming also clearly expressed disapproval. May 25, Wang Keming in an interview with our correspondent, said, "The place to build villas is arable land." He gave reporters the bureau's July 19, 2008 issued the "Order to stop land violations notice." The "notice" shows that: Wang Shitiu for unauthorized construction of housing, violating the "Land administration law of the People's Republic of China," 76th, is ordered to stop the illegal Construction act immediately, awaiting treatment.  The violation is not illegal, the edge of the group built?  June 8, the reporter came to Jiangsu Province Department of Land and resources to understand the situation, the Office of Law Enforcement Supervision staff said that the matter is currently to the Lianyungang Land Bureau for Investigation and Verification, and so the results will be feedback to reporters.  The same day, the Zhangchanghua director of the Office of the National Land Inspectorate Nanjing Bureau on this matter to accept this reporter interviewed, said the farmers reported incidents mainly involved in the first construction of the problem, Nanjing Bureau will promptly investigate and supervise. Zhangchanghua pointed out that the new rural construction is the country's big direction, both saving farmland and improving the living environment of villagers. Although the local county government in order to stimulate the enthusiasm of cadres and masses to participate in the construction of new rural areas, the cultivated land, to the grassroots have a certain level of land indicators, but also must be in accordance with the relevant national policies to act, otherwise it is illegal.  The local township authorities said the new rural construction project sales leaflets show the sale behavior is actually engaged in real estate development, is a typical "trickery". June 11, the reporter again came to the left of the mountain, in charge of the construction of the small town of Cho Gwangyao Deputy Township to reporters, said the land is not really construction land. One side of the river is a part of the original wasteland formed out of the rest of the village to provide farmers with mobile farmland.  But this is diametrically opposed to what the villagers say: this is their arable land, not a wasteland or a maneuver. Cho Gwangyao introduced that the local land is barren, the annual income of each acre is only hundreds of yuan, so many people rely on working out to get rich. Villagers have the money after the desire to build houses, in order to meet the needs of urban and rural construction development, the village Wu Zhuang for urban and rural construction of the overall planning, so that can save 160 acres of arable land.  The problem may be that there is no good communication with the villagers.  Cho Gwangyao said that in the name of the Cangui model village construction in line with the new rural construction of the "20-word policy", and the centralized procurement of housing costs than individual construction cheaper, in fact, 21 villagers representatives only 2 people do not agree, not to mention the villagers from building houses have their own homestead. Turning to the issue of shutdown, Cho Gwangyao's explanation is that, because the territorial department of the whole village relocation, must be submitted to them for approval, but only one year, one year is impossible to remove the entire Wu Zhuang Cun.  There was no approval, so there was a shutdown.  June 12, Donghai County Land Bureau Law Enforcement Monitoring Brigade deputy Captain Wang Keming told reporters, since our correspondent to Jiangsu Province, the Department of Land and Resources, the provincial hall has asked them to immediately investigate and report the situation, and to the reporter produced the bureau about the mountain left Township Stone Bridge new Rural construction land Situation report. In the report, the Bureau made it clear that the new link planning for the old village has not been approved by the provincial office.  Ban Shan Zuo Kou Xiang Shi Qiao He cun new rural engineering stop construction, as soon as possible implementation of new rural construction and demolition of the new plan, strictly according to the provincial department approved the implementation of the plan, the first batch of the construction, strengthen the law enforcement, in the future work to prevent similar incidents occurred. June 15, Jiangsu Province, the Department of Land and Resources assigned to the Office of the letter of the director to interview reporters. In the opinion of the chief executive, because the state advocates newRural construction, concentrated residence, the whole land, the East China Sea practice is illegal, but not illegal, the project has been in the declaration, is a side of the batch built. June 21, the reporter once again came to the left of the village, the discovery of "fresh Spring River Kang-ju new Area" in construction.  Villagers Liu Chunju, Chen Huiying, Du Peimin told reporters that the construction has been 10 days. "Clear Water River Kang Ju xin qu" janitor beam teacher revealed to reporters, the previous contractor did not dry, replaced by the contractor Liang Weidong. At the moment, the construction is being started. All housing standards are 9 meters long and 10.08 meters wide.  Peripheral with the façade is 980 yuan per square meter, which is not with the façade is 880 yuan per square meter, each villa in 200,000 yuan. That afternoon, the reporter repeatedly contacted the Hill left Township party secretary Wang Hua, was its prevarication. Later, in the reporter's request again, Wang Hua finally promised about in the East China Sea car North station to interview. After meeting, Wang Hua told our correspondent, the Kang-ju project is indeed the county to build a model of the new rural construction, but wrong in the province did not get the approval of the Department of Homeland, if the approval and then build, time is too late, because the mountain left to strive to build the country's first new rural demonstration project. About the village cadres to pay 3000 yuan deposit, is not finished the task, will return.  If each village cadre can sell 5 sets of houses, will also give 2000 yuan to reward from the township finance. Wang Hua also told reporters that the cover is not a villa, is a peasant apartment, is for farmers to live, but this and reporters door-to-door visits after the situation is not the same.  The villagers confirmed that these villas are not for them to live, because every household has been divided into the homestead, and then, is not to eat and drink can not afford such an expensive house. On the same day, the reporter put "Qing River Kang-ju new District" has been started construction feedback to Donghai County Land and Resources Bureau deputy Director Ying Hongming.  Ying Hongming said that the Bureau did not know this matter, and did not give them commencement formalities, June 23 to take immediate action to deal with the matter. Developers surfaced as early as May 25, when the Donghai County Bureau of Land and Resources Administration Supervision Brigade deputy Captain Wang Keming took out issued to Wang Shitiu "ordered to stop the land violations notice", the reporter has asked Wang Keming, "Wang Shitiu is not a developer?"  Wang Keming Vaguely said that he did not know who the developers are, who illegal construction, they are looking for, Wang Shitiu is the construction side. Reporters to inquire about the whereabouts of Wang Shitiu not fruit.  Some villagers said that Wang Shitiu has been out of work, he is just a stone bridge of the ordinary villagers, their own houses violated the rules, was punished.  In the interview, the county departments of the identity of the developers are somewhat obscure, which makes reporters feel very strange.  June 22, the fifth time the reporter came to Donghai County Land and Resources Bureau. After many interviews were blocked or was prevarication by the relevant departments, the Bureau Ying Hongming Deputy director finally agreed to the reporter to show two "land and resources illegal cases of inquiry record." A transcript showed that the person asked about Shan Zuo Kou Xiang Shi Qiao He cun Village Committee director and legal representative Zhang Zhifang admits that the whole project covers an area of 65.9 Acres, the compensation to farmers all in place; another transcript showed that the owner of the construction team was asked to Li Dongxhen recognition is April 29, 2008 construction, admitted that "Green River Kang-ju new area" did not see the legal land formalities, the entire project covers an area of more than 100 acres, and annotated "above true without objection" and signed. The reporter immediately contacted Li Dongxhen, his statement and record coincide. Li Dongxhen said that he is only one of the three construction side, there are still some funds do not want to, already do not want to do, there are now Liang Weidong and Zhi Zhijun Two of the construction side.  Li Dongxhen also disclosed an important information to this reporter--the project's developers for Sun Siyuan County Construction Bureau staff Zhaotongwu. Wang Hua also to the newspaper reporter confirmed that the developer is his classmate Sun Siyuan. Wang Hua seems very helpless about the rumor that they have a good relationship.  He said that his request for Sun Siyuan, as long as the quality of housing, meager profit on the line, each set up to earn 10,000 yuan, the other nothing. The Wang Shitiu mentioned above is so shady to do a back "suckers." Earlier, there have been villagers to reporters, Donghai County Bureau of Land and Resources Supervision Brigade deputy Captain Wang Keming to reporters issued to the Wang Shitiu "ordered to stop land violations notice," is to deal with reporters. It seems that the villagers ' statements were finally confirmed. When the reporter to Wang Keming in this question, Wang Keming Xiaoerbuda.  Deputy Director Ying Hongming also said, do not know who Wang Shitiu is. Zhang Xuning analysis of Beijing Shi Hua law firm believes that the illegal occupation of the nature of the event, there are two levels: first, the name of Kang-ju model village to engage in real estate development, sales are in pursuit of profit for the purpose of a commercial development behavior, the construction of the Villa developers need considerable qualifications and submitted for approval can be constructed after the Second, it is illegal to build the occupied farmland without first building, from the requirements of the construction of the new socialist countryside, we should also according to the Law of Land Law and real estate Management law, the nature of land planning is adjusted and approved by relevant government departments, and the procedure can be carried out legally.  Instead of where to build it, build it, who will build it, and how to build it. This newspaper will continue to pay attention to the further developments.
Related Article

Contact Us

The content source of this page is from Internet, which doesn't represent Alibaba Cloud's opinion; products and services mentioned on that page don't have any relationship with Alibaba Cloud. If the content of the page makes you feel confusing, please write us an email, we will handle the problem within 5 days after receiving your email.

If you find any instances of plagiarism from the community, please send an email to: info-contact@alibabacloud.com and provide relevant evidence. A staff member will contact you within 5 working days.

A Free Trial That Lets You Build Big!

Start building with 50+ products and up to 12 months usage for Elastic Compute Service

  • Sales Support

    1 on 1 presale consultation

  • After-Sales Support

    24/7 Technical Support 6 Free Tickets per Quarter Faster Response

  • Alibaba Cloud offers highly flexible support services tailored to meet your exact needs.