Intermediary transaction http://www.aliyun.com/zixun/aggregation/6858.html ">seo diagnose Taobao guest cloud host technology Hall
Unconsciously, I have been engaged in Web site optimization work for half a year. When I first entered the network company, the boss dumped 100 dozens of sites for me to manage, each station needs to complete the task in the limited time. For my debut at that time, it was a pain in the back of my mind, and I never thought that I would have to face so much pressure at the beginning of my work. So, how did I manage to cope with so many stations? Let me share with you the following experience. After I took the "heavy duty", I immediately called to ask my Master after work, after all, he had the same experience, he once worked in the Internet company. However, I get the answer is that I feel how to do, this kind of thing to think about how to allocate good time, no pressure on the progress. Helpless, had to move his brain. But the brain still can not think of a way to, at that time I think that with such a utopian, but also the next day to see how colleagues do.
The next day, I often pretended to go to the bathroom several times, after colleagues of the computer, I found that they are all the sites are recorded in the spreadsheet (Excel), the site of all the information, including domain names, keywords, included, snapshots, outside the chain, etc. are at a glance in the table. So I followed the way they worked and spent two days recording all the information on more than 100 websites in a spreadsheet. I'm sure it would be a lot easier and not so easy to make mistakes.
The next step is to allocate time, which is really hard. A person has only two hands, a mind, in the end how to allocate good time to optimize multiple stations. This I also have no extra time to think, at that time I was really silly, incredibly still every day to update the content of the site. Later, when I was having dinner with my colleagues, maybe they appreciated my serious work attitude, but I was reminded of my inflexible way of working. They said that with our management of so many stations, it is impossible to update the article every station, unless it is very necessary to use a point of idle time to update. Do you like to update the news every day, or original, you can do how many stations ah?
After listening to my colleagues ' reminders, it dawned on me that it was impossible to do what I was doing. So I decided to "mend myself" and come up with more efficient methods. Here the simple saying, in the network company work, piled down so many lists, it is impossible in the short term can be completed. Then we need to pick some customers rush to do the site first, and other sites every one weeks casually do a little bit first. Then is the first use of the station before the first to do the resource station, single chain to the more urgent station, first let the urgent stand up, and then back to the mutual chain. For example, I do this: the visual intercom is not very urgent, there is a period of time can be, then the first use of this station link to the more urgent station: Foshan Freight.
Well, of course, I said the above is entirely my own six months of view, if friends have more management station group method, hope to add me qq:262553632 exchange. The final statement of this article from: Foshan freight http://www.yasuwuliu.com/reprint please keep.